Craigieburn Train Maintenance Facility / HBO+EMTB

Craigieburn Train Maintenance Facility / HBO+EMTB - WindowsCraigieburn Train Maintenance Facility / HBO+EMTB - Facade, Beam, SteelCraigieburn Train Maintenance Facility / HBO+EMTB - FacadeCraigieburn Train Maintenance Facility / HBO+EMTB - Image 8 of 14Craigieburn Train Maintenance Facility / HBO+EMTB - More Images+ 9

  • Architects: HBO+EMTB
  • Area Area of this architecture project Area:  20000
  • Year Completion year of this architecture project Year:  2012
  • Photographs
    Photographs:Dianna Snape 
Craigieburn Train Maintenance Facility / HBO+EMTB - Windows
© Dianna Snape 

Text description provided by the architects. Located on the northern outskirts of Melbourne, the Craigieburn Train Maintenance Facility is the largest of its kind in Australia housing up to 25 trains at a time.

Craigieburn Train Maintenance Facility / HBO+EMTB - Image 2 of 14
© Dianna Snape 

Designed by HBO+EMTB, the project scope included track work, signalling, overhead line design, maintenance roads, bogie pits, train roof access, overhead cranes, tools store, mobile equipment, open yard storage, parking, roads, security, landscaping and staff accommodation.

Craigieburn Train Maintenance Facility / HBO+EMTB - Facade
© Dianna Snape 

The facility takes on distinctly different perspectives as you move around its perimeter and references the rolling hills of Mount Ridley in the distance. It features an organic design sweeping towards the earth that is complimentary to the site’s natural form.

Craigieburn Train Maintenance Facility / HBO+EMTB - Beam, Steel
© Dianna Snape 

In addition to an efficient building layout, attention was given to the need for lifting apparatus, environmentally sustainable design, state-of-the-art railway control systems and complex structures capable of balancing the work environment and functionality.

Craigieburn Train Maintenance Facility / HBO+EMTB - Facade, Beam, Steel
© Dianna Snape 

The building was designed for low environmental impact and delivers significant long term benefits such as the use of recycled water captured off the building’s roof to supply a 125,000 litre rain water tank. This water is used throughout the building and by the train wash facility and amenities. Hydronic in-slab heating has been used in the workshop’s floor and cross flow ventilation has been maximised to reduce the need for mechanical cooling. The choice of materials provide for the facility’s 50-year life cycle and are heavily insulated against the natural elements.

Craigieburn Train Maintenance Facility / HBO+EMTB - Image 10 of 14

Project gallery

See allShow less

Project location

Address:Melbourne, Australia

Click to open map
Location to be used only as a reference. It could indicate city/country but not exact address.
About this office
Cite: "Craigieburn Train Maintenance Facility / HBO+EMTB" 16 Nov 2012. ArchDaily. Accessed . <https://www.archdaily.com/294748/craigieburn-train-maintenance-facility-hboemtb> ISSN 0719-8884